House relevelling in Toowoomba

Jacking a sagging house back to level and packing it there on stumps that are still sound. The smaller job, when the inspection says the stumps have settled into the clay rather than rotted through.

What relevelling is

Relevelling lifts a house that has sagged and holds it level without replacing the stumps. Jacks go under the bearers, the low points come up a few millimetres at a time to a laser line, and the gap between the top of the stump and the bearer is filled with galvanised steel packers, or on adjustable steel stumps the head is wound up. The trade calls it jack and pack. It suits a house whose stumps have sunk into the ground, or were packed badly last time, but are themselves sound. It does not suit a house whose stumps have rotted or been eaten, because a hollow stump cannot be packed; it has to be replaced.

The inspection decides which it is. A stump that is plumb, solid under a probe and dry at the ground line can be relevelled on. One that is soft, hollow, leaning or showing termite mud tubes is a replacement. Under most older Toowoomba houses the answer is some of each, and the quote lists which stumps are which.

Settled, not rotten: why it happens here

On the Downs side of the city a stump settles because the ground under it moves. The black vertosol under Harristown, Glenvale, Drayton and the flat suburbs west of the railway is a cracking clay, the most common soil in Queensland, and it swells when the summer storms soak it and shrinks when the dry winter takes the water back out. A concrete stump set shallow in it will sit high in March and low in September, and over twenty cycles the packing crushes, the stump tilts a little, and the floor above goes with it. The timber is fine, the stump is fine, it is just not where it was.

On the Range it is different. The red ferrosol under Newtown, East Toowoomba, Rangeville and Mount Lofty is a well-drained volcanic soil that moves far less with the seasons, so a stump that has dropped there has usually dropped for a reason: a downpipe discharging beside it for thirty years, a stump hole that was never dug to firm ground, or a corner of the house built over fill when the block was cut. The pattern is a single stump or a short run, rather than a whole side.

Near the escarpment, on the eastern slopes and the gullies, stumps on the downhill side of a cut-and-fill platform settle into the fill while the uphill ones sit on basalt. The pattern is a whole side down, which tells the story before anyone crawls under.

What the owner notices is the same whichever ground it is: a polished hardwood hallway that slopes toward one wall, doors that stick or swing open on their own, a gap opening between the skirting and the floor, a diagonal crack through the VJ boards over a door. The signs guide goes through how to read them. None of them say whether the stumps are settled or rotten; only the inspection does.

What the inspection findsWhat it means
Stumps sound, bearers sound, floor out of level by 20 to 40 mmRelevel. Jack and pack, a day or two, no digging, no new footings.
Stumps sound, a few bearers soft at the endsRelevel plus bearer repair. The floor comes up where a bearer is replaced.
A few stumps rotted, eaten or leaning, most soundPartial restump of the failed ones, relevel the rest, one building approval.
Most stumps rotted or hollowFull restump. Relevelling on rotten stumps buys a season, no more.
Concrete stumps tilted unevenly in black clayRelevel, then fix the drainage. If the ground keeps moving, adjustable steel on the worst corner.
One stump dropped on the red soil under a downpipeRelevel that bearer, move the downpipe to stormwater, check the stump is on firm ground.
Three hydraulic jacks lifting a hardwood bearer back to level under a post-war house in Harristown, a spirit level on the bearer, galvanised steel packers on the concrete stumps, and black cracking clay with wide dry cracks on the subfloor ground.
Harristown: a few millimetres at a time, then the packers go in.

How the work runs

  1. Levels. A laser or water level is run through the house and under it. The high point is found, the low points measured against it, and the pattern read: one corner down is one stump, a whole side down is drainage or fill, a dip in the middle of a room is a bearer.
  2. Old packing found. Many Toowoomba houses have been relevelled two or three times since the war with whatever was on hand: bricks, hardwood offcuts, roof tiles. The crew finds it before the jacks go in, because a loose stack of brick under a bearer is not something to lift against.
  3. Jacking. Hydraulic bottle jacks on hardwood pads go under the bearers near the low stumps. The house comes up in small lifts, checked against the laser each time, so VJ boards, cornices and any brick chimney are not shocked.
  4. Packing. The gap is filled with galvanised steel packers bedded flat. Timber wedges are not used; they crush and the floor drops again, and they feed termites. On adjustable steel stumps the head is wound up instead.
  5. Doors and cracks. As the floor comes level, doors planed to fit a sagging frame can bind and cracks can shift. Some close. The ones that do not are patched afterwards.
  6. Drainage. If the stumps moved because the clay around them is alternately soaked and parched, the ground is regraded and downpipes connected to stormwater, otherwise the relevel is temporary. The soils and drainage guide covers that work.
Packing over about 25 mm is a sign the house has been relevelled before, and a building inspector will say so in the pre-sale report.

Does relevelling need approval?

If no stump or footing is replaced and no structural component is altered, relevelling may be accepted development under Schedule 1 of the Building Regulation 2021, which covers repairs that do not affect a structural component. Council's where to start page says most structural work needs approval and some minor work does not, and Logan City Council's fact sheet puts the restumping line at 20% of the structural components. The moment a stump comes out or a bearer is cut, the question changes and a building development permit from a licensed building certifier is likely. The certifier makes that call, not the builder, and a duty certifier is at the Toowoomba Service Centre on Tuesdays and Thursdays from 9 to 4.30 if you want to ask before booking anyone.

The licence does not change with the approval. Any building work over $3,300 needs a QBCC licence in a class that covers it, which for a house is Builder Low Rise or higher, and a relevel with a crew, jacks and a day or two on site is usually over that line. Between $3,301 and $19,999 that means a Level 1 contract, written and signed before work, with the deposit capped at 10%, a cooling-off notice and the Queensland Home Warranty Scheme premium paid by the builder within 10 business days of signing. A relevel under $3,300 needs no contract and no licence, and a 20% deposit cap applies; but the same jacks, the same crew and the same risk to the house are under the floor either way, so we would still want a licensed builder.

Heritage is the other question. A relevel that puts the floor back where it was built does not change the street view, and the Heritage overlay and Neighbourhood Character overlay apply to listed places and mapped areas rather than to every old house; Toowoomba has no blanket pre-1946 rule. Where the floor would come up above the original line or the base cladding has to be altered on a listed house in East Toowoomba or Newtown, ask council's planning team first.

Timing on the Downs

A house at Harristown or Drayton relevelled in February, when the ground is at its wettest and the clay at its most swollen, can sit differently by August as the clay dries and shrinks. Where there is a choice, the levels are taken in the dry season and the relevel is done then, because the Bureau's record puts the city's wettest month in January at 132.1 mm and the driest months in winter, with July the coolest at a mean maximum of 16.3 and a mean minimum of 5.3. Spring 2019, the driest on record on the Darling Downs, is a reminder of how far the clay can shrink: the airport recorded 23.8 mm for the season against a 169.6 mm average, and houses relevelled before it were out again after it. On the red soil of the Range the season matters far less.

What a relevel quote should say

A relevel is a small job and the quote is often a line or two, which is where trouble starts. It should name the stumps that will be packed by position, the amount of lift expected at each, the packer material, and which stumps the inspection found soft, tilted or eaten and are therefore not being relevelled on. It should say whether a certifier has been asked about approval and what the answer was. It should say what happens to the bearers found soft while the jacks are under them, and how that is priced. It should carry the builder's QBCC licence number. And it should say whether the ground under the house is being regraded and the downpipes connected, because on the black clay a relevel without drainage is a relevel booked again in three summers. If the quote says relevel the house and nothing else, ask for the rest in writing before the crew arrives.

What relevelling cannot fix

Relevelling cannot make a rotten or termite-eaten stump sound; it can only sit a bearer on it for a while. It cannot stop black clay moving, so on the Downs side it needs drainage or adjustable stumps behind it to last. It cannot put ground back under a stump that was never dug to firm soil; that stump is replaced. It cannot square a door frame that was racked when the house dropped; a carpenter does that after the floor is level. It cannot fix a brick veneer on a strip footing, which is underpinning and an engineer. And it cannot settle whether approval is needed; the certifier does that.

Written October 2026

Check the current rules before you rely on this

This page describes house relevelling on existing stumps in Toowoomba and when it crosses into assessable building work. It describes the rules in general terms as they stood in October 2026. Standards, forms, thresholds and fines change.

The authoritative sources are Toowoomba Regional Council, where to start with building work, Logan City Council fact sheet, building approval requirements for domestic work, QBCC, when you need a licence, QBCC, domestic building contract levels and Bureau of Meteorology climate statistics, Toowoomba (city). Where anything here differs from those sources, they are right and we are not.

We are not building certifiers, engineers, planners or lawyers. For what applies to your house, ask a licensed building certifier or ring Toowoomba Regional Council on 131 872.

Accurate at the time of writing, October 2026. Always check the source before relying on it.

Questions

Common questions

What is the difference between relevelling and restumping?

Relevelling lifts the house on the stumps it already has and packs the gap with steel. Restumping replaces the stumps. Relevelling only works where the stumps are sound; a rotten, hollow or badly tilted stump cannot be packed. The subfloor inspection, with a probe at the ground line of every stump, decides which job it is.

How much can a house be lifted?

Only as far as it has dropped. The aim is to bring the floor back to the line it was built on. Lifting beyond that strains the frame, cracks VJ boards and plaster and, on a house with a brick chimney, cracks mortar. Most relevels are 10 to 40 mm at the low points, done a few millimetres at a time against a laser.

Does relevelling need building approval?

Possibly not, if no stump or footing is replaced and nothing structural is altered, because repairs that do not affect a structural component may be accepted development under the Building Regulation 2021. The licensed building certifier decides, not the builder. As soon as a stump comes out or a bearer is cut it is likely to need a building development permit.

Why did the floor drop again after it was relevelled?

Three usual reasons in Toowoomba: the stumps are in black cracking clay and the ground moved again with the seasons, the stumps were rotten and the packing has crushed into them, or timber wedges were used instead of steel packers. A fourth on the Range: a downpipe is still discharging beside the stump. The inspection before a relevel is meant to catch all of them.

Can a brick veneer house be relevelled?

If it sits on stumps under a timber floor, yes, with very small lifts so the brickwork is not stressed. If it sits on a slab or a strip footing, no; that is underpinning with an engineer's design. Many post-war Toowoomba houses have a brick front on footings and a timber back on stumps, and only the back can be relevelled.

Does the builder need a QBCC licence for a relevel?

If the work is over $3,300 in labour, materials and GST, yes, in a class that covers building work on a house, which is Builder Low Rise or higher. A relevel with a crew and a day or two on site is usually over that line. Under $3,300 no licence is required, but the same jacks are under your house, so we would still use a licensed builder.

What are the packers made of?

Galvanised steel in a range of thicknesses, bedded flat between the stump and the bearer. Timber, brick and roof tile packing is what gets found under old Toowoomba houses and what gets taken out. Steel does not crush, rot or get eaten, which matters in a region where QBCC says termites are a problem throughout.

Will the doors work afterwards?

Doors that bound because the frame dropped usually free up. Doors that were planed to fit the sag can bind when the frame comes back square and need adjusting. Both are normal, and a carpenter sorts them in an hour or so once the floor is where it belongs.

Next step

Send a few photos and a town

The worst room, the outside of the house and, if you can get to it, a stump or two under the floor. That is usually enough for a price range before anyone visits.